Complete path to new bus stop and the entire block along Montague Expressway, from De La Cruz Blvd. to bridge over Guadalupe River.

Click any photo to enlarge. To view in large format, first enlarge, then click "next". Click "up" to return.


Temporary bus stop (eastbound), Montague at DeLaCruz Blvd in Santa Clara.
Temporary bus stop (eastbound), Montague at DeLaCruz Blvd in Santa Clara.
Path to LRT on First Street and probable new bus stop (shown).
Path to LRT on First Street and probable new bus stop (shown).
Path now swerves around the sawdust pile dumped on path.
Path now swerves around the sawdust pile dumped on path.
Looking backwards, Montague at DeLaCruz.
Looking backwards, Montague at DeLaCruz.
Road was widened, former path was covered with asphalt.
Road was widened, former path was covered with asphalt.
New asphalt covers up path.
New asphalt covers up path.
Path near soundwall after widening.
Path near soundwall after widening.
Montague bridge over Guadalupe River (south side). Sidewalk on bridge was destroyed in 2005 when adding lane.
Montague bridge over Guadalupe River (south side). Sidewalk on bridge was destroyed in 2005 when adding lane.
Distance, curb to wall, is 5 to 8 feet and is overgrown. Peds use shoulders here. Lengthen path and add ADA ramp from path to shoulder (former sidewal
Distance, curb to wall, is 5 to 8 feet and is overgrown. Peds use shoulders here. Lengthen path and add ADA ramp from path to shoulder (former sidewalk)
Photos taken summer 2007 by Akos Szoboszlay.