<--Previous  [Return to all-photos]  Next-->

Open the wall near here and create path along San Tomas to El Camino (at signal).

Open the wall near here and create path along San Tomas to El Camino (at signal).

The Master Plan already requires creating a path from here to the intersection because it is part of the "intersection area", as is apparent by the dashed stripping of the shoulder line. Eventually, this would be a paved sidewalk. (Southbound, approaching El Camino.)