<--Previous [Return to all-photos] Next-->
Open the wall near here and create path along San Tomas to El Camino (at signal).
The Master Plan already requires creating a path from here to the intersection because it is part of the "intersection area", as is apparent by the dashed stripping of the shoulder line. Eventually, this would be a paved sidewalk. (Southbound, approaching El Camino.)